Redburn successfully delivered 6.2km of new dual 110mm ducting and cabling in Ripponden, West Yorkshire, on behalf of OCU Group and Vodafone. The turnkey project covered full civils delivery, reinstatement, and traffic management — completed three months ahead of schedule with a 98% right-first-time quality rate. Through early design engagement and close collaboration with the council, Redburn ensured efficient delivery with minimal disruption to residents and businesses.

Delivering 6.2km of new 2 × 110mm duct installation and cabling

Comprehensive civils and fibre delivery

Redburn was appointed by OCU Group to support Vodafone’s network expansion in Ripponden, West Yorkshire. The project involved the installation of 6.2km of new dual 110mm ducting and cabling, providing a vital upgrade to regional connectivity infrastructure.

Our scope included civils works, reinstatement, grab support, and traffic management. Extensive trenching was carried out along main and trunk roads, requiring detailed coordination with local authorities and stakeholders to minimise disruption to road users and residents.

Delivered ahead of the baseline schedule, the project reflected Redburn’s ability to combine precision planning with flexible on-site execution — ensuring continuity of service and a safe working environment throughout.

Excellence in design and stakeholder management

Strong collaboration with client and council

From the outset, Redburn established clear communication channels with both OCU and the local council. Early engagement during the design and pre-construction stages enabled us to identify and mitigate potential issues before works commenced.

Pre-site surveys carried out by Redburn highlighted design inconsistencies which were addressed before mobilisation, preventing delays and avoiding rework during the main build. This proactive approach ensured full programme integrity and maintained the highest standards of safety and compliance.

Assurance through testing and quality control

Performance verified through robust QA procedures

Quality and compliance were central to the project’s success. Redburn conducted full coring, Clegg testing, and reinstatement recording across all work areas to verify structural integrity and alignment with client specifications.

The project achieved:

  • 98% right-first-time quality rate
  • 100% remediation within 48 hours of any defects identified
  • Zero safety incidents across the entire programme duration

Ahead of schedule, with minimal disruption

Efficiency, safety, and community focus

Redburn’s planning-first methodology and strong local relationships enabled works to progress efficiently despite challenging access and road conditions. Effective traffic management ensured minimal disruption to residents and businesses, while proactive communication maintained public confidence throughout delivery.

The project was completed three months ahead of programme, reflecting Redburn’s ongoing commitment to operational excellence, safe working practices, and client satisfaction.

Collaborative project delivery

Building lasting partnerships through performance

The Ripponden Fibre Deployment showcases Redburn’s capability to deliver complex telecoms infrastructure safely, efficiently, and to the highest quality standards. Through early engagement, effective coordination, and continual quality monitoring, Redburn reinforced its reputation as a trusted partner for major network operators and contractors nationwide.

Want to learn more?

Get in touch with our team to discuss your next project or learn more about our work across the UK’s utilities and infrastructure sectors.